BYU-Idaho, Storm Detention and Drainage

Location

Location: REXBURG, IDAHO

Location

Client: BYU-IDAHO

Expertise

Expertise: Water Resource

Our Expertise > BYU-Idaho, Storm Detention and Drainage

Keller Associates completed the site, civil and construction engineering for the new Auditorium and Manwaring Center project at BYU-Idaho in Rexburg. The projects included site civil design for the 15,000-seat auditorium and multipurpose building.

Project Features:
  • The storm water drainage system for this project consisted of 20 acres
  • Storm CAD was used to model the storm water drain system
  • Preconstruction analysis and calculations were performed to determine existing and future runoff conditions
  • Design incorporated a new 246,000-gallon concrete storm water detention tank. The roof of the detention facility
    will also serve as the substructure for the new Manwaring Center parking lot
  • The detention facility was designed to regulate flow out of the tank to the City stormwater system